Este trabalho em andamento foi arquivado. Isso pode ser devido a um longo período de inatividade ou por decisão do autor. Não podemos saber se será atualizado novamente mais tarde ou não.
we move slowly because of the work on the farm but surely.
- the highway is almost finished as well as the tp construction sites along it
- adaptation of an already existing coop to farming in a SCAM point of sale
-concess finished and tested
- addition of a farm (see img. 1)
- addition of JD dealer but still needs to be personalized (img 2)
- addition of roads and fields (img 3)
- finished surface of the doubled map
- addition of ditch cleaning works and gravel
sympa le concession mais essaye de le faire grand (le parc) pour qu'on puisse manœuvrer :)